Frequently Asked Questions

At Rollalong, we understand that modular construction can raise many questions, from planning and regulations to design timelines and long-term reliability. We’ve compiled answers to the most common queries to help you make informed decisions and feel confident about your project.

If you don’t see your question here, or would like more detailed advice, our team is always ready to help. Contact us and we’ll provide the information you need to ensure your modular project runs smoothly from start to finish.

What is modular construction?
Modular construction is a modern building method where sections of a building, known as modules, are manufactured off-site in a controlled factory environment. Often, interiors such as kitchens, lighting, and heating are installed during this process. The modules are then transported to the site and assembled quickly, safely, and efficiently. This approach enables faster construction, consistent quality, and minimal disruption compared to traditional building methods.

More info on modular costruction

Do I have to compromise on my building if I go modular?
No, if you engage a modular builder from the start, there should be no compromise on the solution.

If we take a standard 3-bedroom house, once built to the same spec, both a modular home and a traditionally built home would look and function very much the same; the owner would not be able to tell the difference.

Are modular buildings permanent or temporary?
Both. We install both permanent and temporary buildings; however, 90% of the projects we produce are permanent.

We also have a temporary modular accommodation that is built to be relocated and has a lifespan of over 60 years.

What are the advantages of modular buildings compared to traditional construction?
There are many reasons someone might choose a modular building over a traditional one.

  1. Quality and compliance – The fact that we are building a modular builder that owns the process from concept to completion means that we are directly employing all the details and trades, which means there are no gaps in terms of ownership and reasonability. Plus, the fact that our buildings are manufactured off-site in a controlled environment results in an enhanced product.
  2. Speed of delivery – modular buildings reduce the time of construction by up to 50%
  3. Security – If the location of the building is sensitive (military, ‘list X’ ) or live (school), then selecting to deliver your building using a modular approach vastly reduces not just the time of people on site, but also the number of people on site
  4. Cost – With modular delivery, we can define project costs with greater accuracy from the outset. Rollalong provides clients with cost certainty and reduces the risk of budget overruns.
How long do modular buildings last?
Modular buildings last just as long as traditional buildings. Rollalong’s modular structures are built using durable materials in a controlled factory environment and are accredited for a 60-year design life, matching the lifespan and performance of conventional construction.
How do I get the best from using a modular company?
All good modular builders offer a full turnkey solution, and at Rollalong, we always recommend this approach first. We manage the entire process for you from concept and planning, through groundworks, manufacturing, installation, and handover ensuring a seamless project from start to finish.

When you work with Rollalong, you’re not just buying a building. You’re gaining a complete, multi-disciplinary team, including designers, quantity surveyors, project managers, and a fully accredited supply chain, all working together to deliver your project efficiently and to the highest quality standards.

Are there issues around the financial stability of Modular companies?

There have been high-profile issues in the modular sector involving new players. These have grabbed the headlines, and like bad news, travel fast and wide. We must put that in the same context as other businesses in the construction sector. Let’s face it, construction can be a difficult business to be in.

Research shows that the probability of a modular provider going under is lower than that of many other parts of the construction market. For example, the average age of a modular company is 16.1 years, and while 21 modular businesses went into administration in the past three years, this represents less than 2.5% of recorded construction business failures. By comparison, 84 times as many M&E businesses failed in the same period.

In short, choosing modular construction is often safer than traditional methods, though it’s always sensible to carry out some basic due diligence.

How do I choose the right modular builder?
Like any major purchase, choosing a modular supplier takes research and asking the right questions. Construction projects run over months or years, so it’s essential to pick a supplier you can build a long-term relationship with. Here are some quick “stress tests” you can run, which should take less than 15 minutes to answer:

  1. Trading history – Longevity matters. Companies that have weathered economic challenges like COVID, wars, or high inflation are more likely to be stable. Rollalong, for example, has been trading for over 90 years.
  2. Order book diversity – Suppliers focused on multiple sectors (e.g., residential, defence, education) are more resilient. A company that relies solely on one sector is vulnerable to policy, funding, or market fluctuations.
  3. Payment terms – If a business requires a large upfront payment for materials (>10%), this flags cashflow concerns. A strong modular business should give you milestone payments, such as a design freeze (for design costs). With most projects, the next payment should be the vesting of the finished buildings as they come down the production line, then site works on monthly valuations. If the modular builder cannot cashflow the work in progress to vesting, ask why. If we are getting into >£10-20m projects with long delivery schedules and specialist equipment such as lifts, then the client-to-manufacturer relationship should support cash flow. But it should be linked to materials, supported by invoices, and not to cover labour costs.
  4. Ownership structure – Check who owns and actively runs the company. UK-based owners with an ongoing active role typically indicate stability. History shows that modular companies reliant solely on private equity can be higher risk if issues arise.
  5. People first – Construction is a long-term collaboration. Meet at least one director listed on Companies House and assess whether you trust and can build a working relationship with them. This personal connection is crucial if challenges occur during the project.
Can modular buildings meet UK building regulations?
Yes, all good modular building suppliers see building regulations as a minimum requirement and should be able to offer you a solution that is best-in-class in terms of compliance.
How long does it take to design and deliver a modular building?
We typically move from concept to RIBA Stage 3 design (ready for planning) in just 6 weeks. We then allow a further 4–6 weeks to complete RIBA Stages 4 and 5. Thanks to standardisation, modular companies can significantly accelerate the design process.

Production times vary with building size, but a standard modular building can pass through our factory in around 4 weeks. Altogether, this means a typical project takes roughly 14 weeks from initial idea to handing over the keys.

Is Rollalong the UK's longest-running modular construction company?
Yes, Rollalong is the UK’s longest-established modular company, having been building since 1932. Over the decades, we’ve delivered everything from a caravan for the current King to large-scale Ministry of Defence contracts. Our longevity demonstrates our ability to trade successfully through generational and economic challenges, making us a trusted partner for any modular project.
Do I need planning for a modular building?
Planning requirements in the UK depend on regulations, not the construction method. At Rollalong, we follow a simple rule: if the building will be in place for more than 28 days, it will likely require planning permission.

There are exceptions for certain building classes, state-funded schools, and specialist projects (The Town and Country Planning), but it’s always essential to check with your local authority. Don’t assume a temporary building is automatically exempt; seek advice before proceeding.